DOE April Workshop

Saw Irene Dutta (HH) met her in Boston for LPC(Caltec->FNAL)

https://indico.cern.ch/event/1539162/

AM

Steves talk:

  • T.J. Sarlina was our EH&S
  • Adi Bornheim (caltech)
  • Met Don Linconln
  • Missed most of it
  • What is the BTST incident ?
  • Already defunded OT Objective scope per CMS schedule?
  • "I &I" installation and integration

MTD Chris Neu:

  • BTL concentrator boards with lBGPTs have to be reworked.

L1T Jeff Berryhill

  • Everyone use Samtech transcievers

CE Jeremey

  • DC-DC cant take to the radiation
  • Good discussion of v3B C D and E
  • KPP: key performancs parameters
  • Replace students and experienced grad students with professional positions

OT Petra

PM

My Talk

  • Feed back here: HGC Slides for April 2023 Review
  • [ ] Do we have a risk for the ESD damage ?
  • [ ] Summary is the opportunity to provide the takeaway
    • [ ] What do you want them to write about you
  • [ ] In the slides you cite BCR0082 for improving the labor costs at the MACs, but this BCR is scintillator-specific.
  • [ ] Feedback HGC Slides for April 2023 Review
  • [ ] The message should be we are in production and executing. We know what we are doing. and we are doing it.

Ted

  • Good

Nadja

  • Good

Zoltan's talk was not great