DOE April Workshop
Saw Irene Dutta (HH) met her in Boston for LPC(Caltec->FNAL)
https://indico.cern.ch/event/1539162/
AM
Steves talk:
- T.J. Sarlina was our EH&S
- Adi Bornheim (caltech)
- Met Don Linconln
- Missed most of it
- What is the BTST incident ?
- Already defunded OT Objective scope per CMS schedule?
- "I &I" installation and integration
MTD Chris Neu:
- BTL concentrator boards with lBGPTs have to be reworked.
L1T Jeff Berryhill
- Everyone use Samtech transcievers
CE Jeremey
- DC-DC cant take to the radiation
- Good discussion of v3B C D and E
- KPP: key performancs parameters
- Replace students and experienced grad students with professional positions
OT Petra
PM
My Talk
- Feed back here: HGC Slides for April 2023 Review
[ ]Do we have a risk for the ESD damage ?[ ]Summary is the opportunity to provide the takeaway[ ]What do you want them to write about you
[ ]In the slides you cite BCR0082 for improving the labor costs at the MACs, but this BCR is scintillator-specific.[ ]Feedback HGC Slides for April 2023 Review[ ]The message should be we are in production and executing. We know what we are doing. and we are doing it.
Ted
- Good
Nadja
- Good